top of page
header_progetto_spes.jpg

SPES

National Institute for Nuclear Physics Complex

CLIENT:Istituto Nazionale di Fisica Nucleare Laboratori Nazionali di Legnaro
LOCATION: LABORATORI NAZIONALI DI LEGNARO, PADOVA.
COMMISSIONER: NBI Spa
YEAR: 2015

Realization of Buildings and Systems for the SPES Project Partial Phase 1 in the Complex of the National Institute for Nuclear Physics – Legnaro National Laboratories, Padua.
 The systems subject to the design can be summarized as follows:
1.1.1.1 Termomechanical Systems

  • Thermal and refrigeration plants;

  • Water plant;

  • Thermal-refrigeration sub-station;

  • Air conditioning systems;

  • Air handling systems;

  • Technical gas distribution systems;

  • Plumbing and drainage system;

  • Fire prevention systems;

  • Electrical systems serving the termal engineers;

  • Automatic regulation;

Electrical Systems

  • Main Low Voltage (LV) network;

  • Continuous energy conversion systems for safety systems;

  • Continuous energy conversion systems for IT continuity systems;

  • Main electrical panels;

  • Secondary electrical panels;

  • Secondary distribution network;

  • Terminal distribution (for lighting and motive power utilities);

  • Lighting fixtures;

  • Protection systems (earthing system, lightning protection system, potential equalization system, fire compartmentations);

  • Electrical systems for thermomechanical systems;

foto1-spes-300x300.jpg
footer-spes.jpg
foto2-spes-300x300.jpg

1.1.1.2 Special Systems

 

  • Fire detection system (only predisposition);

  • Anti-intrusion system (only predisposition);

  • Access control system (only predisposition);

  • CCTV video surveillance system (only predisposition);

  • Sound diffusion system – EVAC (only predisposition);

  • TV and TVsat reception system (only predisposition);

  • Structured cabling;

bottom of page