top of page


SPES
National Institute for Nuclear Physics Complex
CLIENT:Istituto Nazionale di Fisica Nucleare Laboratori Nazionali di Legnaro
LOCATION: LABORATORI NAZIONALI DI LEGNARO, PADOVA.
COMMISSIONER: NBI Spa
YEAR: 2015
Realization of Buildings and Systems for the SPES Project Partial Phase 1 in the Complex of the National Institute for Nuclear Physics – Legnaro National Laboratories, Padua.
The systems subject to the design can be summarized as follows:
1.1.1.1 Termomechanical Systems
-
Thermal and refrigeration plants;
-
Water plant;
-
Thermal-refrigeration sub-station;
-
Air conditioning systems;
-
Air handling systems;
-
Technical gas distribution systems;
-
Plumbing and drainage system;
-
Fire prevention systems;
-
Electrical systems serving the termal engineers;
-
Automatic regulation;
Electrical Systems
-
Main Low Voltage (LV) network;
-
Continuous energy conversion systems for safety systems;
-
Continuous energy conversion systems for IT continuity systems;
-
Main electrical panels;
-
Secondary electrical panels;
-
Secondary distribution network;
-
Terminal distribution (for lighting and motive power utilities);
-
Lighting fixtures;
-
Protection systems (earthing system, lightning protection system, potential equalization system, fire compartmentations);
-
Electrical systems for thermomechanical systems;



1.1.1.2 Special Systems
-
Fire detection system (only predisposition);
-
Anti-intrusion system (only predisposition);
-
Access control system (only predisposition);
-
CCTV video surveillance system (only predisposition);
-
Sound diffusion system – EVAC (only predisposition);
-
TV and TVsat reception system (only predisposition);
-
Structured cabling;
bottom of page